Dugardin, FredericYalaoui, FaroukAmodeo, LionelTanyaş, MehmetBamyacı, Muhammed2024-07-122024-07-122010Dugardin, F., Yalaoui, F. ve Amodeo, L. (2010). Multi-objective scheduling of a reentrant hybrid-flowshop problem. VIII. International Logistics & Supply Chain Congress 4th-5th November 2010: ´´Trade and Freight: From Soil Consumer´´. Maltepe Üniversitesi. s. 547-552.https://hdl.handle.net/20.500.12415/4894This paper deals with the scheduling of reentrant hybrid-flowshop production lines. In this article, two objectives are simultaneously minimized: the sum of the total tardiness of the jobs and the maximum of their completion times...enAttribution-NonCommercial-NoDerivs 3.0 United Statesinfo:eu-repo/semantics/openAccessAnt colonySchedulingHybrid systemFlow-shopFuzzy fogic controllersMultiobjective optimizationMulti-objective scheduling of a reentrant hybrid-flowshop problemBook Part552547