Multi-objective scheduling of a reentrant hybrid-flowshop problem
Küçük Resim Yok
Tarih
2010
Dergi Başlığı
Dergi ISSN
Cilt Başlığı
Yayıncı
Maltepe Üniversitesi
Erişim Hakkı
Attribution-NonCommercial-NoDerivs 3.0 United States
info:eu-repo/semantics/openAccess
info:eu-repo/semantics/openAccess
Özet
This paper deals with the scheduling of reentrant hybrid-flowshop production lines. In this article, two objectives are simultaneously minimized: the sum of the total tardiness of the jobs and the maximum of their completion times...
Açıklama
Anahtar Kelimeler
Ant colony, Scheduling, Hybrid system, Flow-shop, Fuzzy fogic controllers, Multiobjective optimization
Kaynak
VIII. International Logistics & Supply Chain Congress 4th-5th November 2010: ´´Trade and Freight: From Soil Consumer´´
WoS Q Değeri
Scopus Q Değeri
Cilt
Sayı
Künye
Dugardin, F., Yalaoui, F. ve Amodeo, L. (2010). Multi-objective scheduling of a reentrant hybrid-flowshop problem. VIII. International Logistics & Supply Chain Congress 4th-5th November 2010: ´´Trade and Freight: From Soil Consumer´´. Maltepe Üniversitesi. s. 547-552.