Multiple-criteria assembly flowshop scheduling problem

dc.contributor.authorAl-Anzi, Fawaz S.
dc.contributor.authorAllahverdi, Ali
dc.date.accessioned2024-07-12T20:49:43Z
dc.date.available2024-07-12T20:49:43Z
dc.date.issued2009en_US
dc.departmentFakülteler, İnsan ve Toplum Bilimleri Fakültesi, Matematik Bölümüen_US
dc.description.abstractDifferent performance measures are considered in the scheduling research. These performance measures may be classified as completion time related or due date related. Makespan (Cmax), a completion time related performance measure, is one of the most widely used performance measures. Minimizing makespan is important in situations where a simultaneously received batch of jobs is required to be completed as soon as possible. For example, a multi-item order submitted by a single customer needs to be delivered as soon as possible. The makespan criterion also increases the utilization of resources. Minimizing maximum lateness (Lmax) is a widely used due date related measure. This objective is particularly important in situations where there is a penalty to complete a job beyond its due date and the penalty increases with the gap between the two. We consider a two-stage assembly flowshop scheduling problem with the objective of minimizing a weighted sum of makespan and maximum lateness. The problem is known to be NP-hard, and therefore, we propose heuristics to solve the problem. The proposed heuristics are Tabu search (Tabu), particle swarm optimization (PSO), and self-adaptive differential evolution (SDE). An extensive computational experiment is conducted to compare the performance of the proposed heuristics. The computational experiment reveals that both PSO and SDE are much superior to Tabu. Moreover, it is statistically shown that PSO perform better than and SDE. The computation time of both PSO and SDE are close to each other and it is less than 45 seconds for the largest size problem considered.en_US
dc.identifier.citationAl-Anzi, F. S. ve Allahverdi, A. (2009). Multiple-criteria assembly flowshop scheduling problem. Maltepe Üniversitesi. s. 162.en_US
dc.identifier.endpage163en_US
dc.identifier.isbn9.78605E+12
dc.identifier.startpage162en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12415/2213
dc.language.isoenen_US
dc.publisherMaltepe Üniversitesien_US
dc.relation.ispartofInternational Conference of Mathematical Sciencesen_US
dc.relation.publicationcategoryUluslararası Konferans Öğesi - Başka Kurum Yazarıen_US
dc.rightsCC0 1.0 Universal*
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttp://creativecommons.org/publicdomain/zero/1.0/*
dc.snmzKY07535
dc.titleMultiple-criteria assembly flowshop scheduling problemen_US
dc.typeConference Object
dspace.entity.typePublication

Dosyalar